Sampling Phase

The Sampling Phase commenced on 1 August 2011 however in some cases sampling work commenced prior to the conclusion of the Consultation Phase.   

The Sampling Phase is drawing to a close. Eligible participants who have correctly completed a participation agreement but have not yet had samples taken from their properties are requested to immediately contact the LAS Team to arrange a suitable time for an authorised representative to attend the property to take samples. 


What will the authorised representative do when they attend my property?

The authorised representative will select five (5) areas of bare soil or grassed areas within the participant’s yard (where possible) and take five (5) soil samples from each of the selected areas.  The soil samples will be approximately 50mm deep and 50mm wide. 

The LAS does not include flower beds, driveways, sealed areas, outhouses, sheds or dwellings or soils within a two metre proximity to buildings.

The sampling technique that will be used is in accordance with the procedure endorsed by the NSW Environment Protection Authority (“EPA”) in the 1995 Pasminco development consent.

The authorised representative will also ask the participant some questions in respect of the history of the property, specifically in respect of any previous abatement works or construction at the property. 

Where a tenant is occupying the property, participants will be contacted by the authorised representative to discuss the history of the property.


What do the samples measure?

The samples will measure the average lead levels (parts per million “ppm”) within the surface soil in bare soil and grassed areas. 


Who analyses the samples?

The samples will be sent to an independent laboratory for analysis.  The independent laboratory will analyse the samples and provide a report on the average ppm lead content.

The sampling results will be provided in a report to the participant, the DOP, the DECCW and the LMCC. 


When will I receive the sampling results for my property?

Residents will receive a report outlining the sampling results for their property in due course once sampling result shave been obtained and certified.


What happens after the sampling results have been provided?

The results will be categorised into result ranges based on the average sample results of the lead levels within the soil, this will determine the level of works required. Below is a table of the result categories and respective works.

The LAS team will write to the participant and advise of the level of works to be completed at the property.

Prior to any work commencing at the property, the participant must confirm in writing that they agree to the proposed works.


Why have I not received my results?

The LAS team is endeavouring to provide the sampling results to residents as they are available. However, with a large number of participants and a stringent certification process, there may be some delay in participants receiving their results.  


What if I do not agree with the proposed works?

If you do not agree with the proposed works, please contact the LAS Team to discuss your concerns.  You may be asked to provide your concerns in writing so that the LAS Team are able to respond to you formally.

Alternatively, you can choose to carry out your own work at your own expense and make arrangements with the LAS team to deposit the contaminated material in the site containment cell prior to its closure.

Please note that only the above works relevant to the appropriate sample result range will be conducted under the LAS.  Participants who wish to undertake additional works do so at their own cost. 


Do I have to agree to undertake the proposed works?

The LAS is a voluntary, opt in, program.  Participants are permitted to withdraw from the LAS at any stage.  Participants who no longer wish to participate in the LAS are required to notify the LAS Team in writing.


Who do I contact if I have queries regarding the Sampling Phase?

If you have any questions regarding the LAS Sampling Phase please do not hesitate to contact the LAS Team.

Telephone: 1300 992 342 (toll free)

Email: This e-mail address is being protected from spambots. You need JavaScript enabled to view it.

Postal Address: LAS Team, PO Box 16110, Collins Street West, Melbourne VIC 8007


Disclaimer:

Please note that the content of this website is a summary of the LAS program and its various phases, as proposed by the Deed Administrators, for the purpose of informing residents of the possible application of the LAS to their property.  Reliance should not be placed on the content of this website to determine your eligibility to participate in the LAS.  To obtain further information regarding the LAS and to ascertain the eligibility criteria and terms of the LAS, as they apply to you please contact the LAS Team.  Further particulars of the LAS are available upon request.

 